Coordinated RCPs · Guide 2 of 8

Ceiling clashes found on site

Most ceiling clashes are not found in the model. They are found on site, by an installer with a drill in hand.

The problem

Each trade produces its own layout. The ceiling contractor, electrician, mechanical installer and sprinkler fitter all work from different drawings. In 2D they look fine. In the void, a duct runs where a light fitting needs to drop, or a sprinkler head lands on a grid line. Once on site, the fix is made by whoever is there. A fitting moves 200mm, a tile is cut, a bulkhead appears. The architect usually sees it at the snagging walk, when it is too late to change.

Why it keeps happening

Nobody owns the ceiling as a whole. Each trade protects its own scope, and the ceiling is where all of them meet. Clash detection helps, but only if every trade models to the same detail and the model is kept up to date.

How A&L solves it

SEAM and REVEAL channels are pre-coordinated before they are made. We take the RCP and the services layouts and fix the channel runs, cut lengths and junctions to suit them. Clashes are resolved on the drawing, not on the day. Every channel is cut to length for its location, so there is less guesswork on site. Junctions, corners and end caps are drawn and made as part of the system, not improvised. Services trades install into a known zone, so their positions are fixed before they arrive. The result is fewer site decisions, fewer variations and a ceiling that matches the RCP.

What to do next

Share your RCP and services layouts with us. We will return marked-up channel drawings showing where each run sits and where any clash risk remains.

Protect your ceiling from drawing to delivery

UK-Manufactured, Pre-Coordinated SEAM and REVEAL channels from up to 100% recycled aluminium.

Send us your RCP

Related products

Related guides

All eight guides

  1. Late M&E information on the RCP
  2. Ceiling clashes found on site
  3. When ceiling grids don't align
  4. RCP revisions that don't reach site
  5. Value engineering and ceiling substitution
  6. Tolerances on aluminium ceiling profiles
  7. Ceiling compliance versus design intent
  8. Keeping control of the ceiling after novation
Coordinated RCPs