The problem
Tenant changes, lighting redesigns and late M&E information all trigger new RCP revisions. By practical completion, a ceiling can have gone through ten or more. Each trade picks up revisions at a different pace. The ceiling installer works from revision F, the electrician from revision D. The ceiling ends up as a mix of both.
Why it keeps happening
The RCP is a combined drawing, but each trade only reads the part that affects them. When a change is issued, nobody checks how it affects the other trades in the same ceiling. Products bought early are often already made or delivered to an old layout.
How A&L solves it
We work to one coordinated channel drawing that sits alongside the RCP. When the RCP changes, the channel drawing is updated and reissued before anything is made. Channels are made to order from signed-off drawings, with a 4-week lead time. Nothing is cut until the layout is agreed. UK-manufactured and UK-stocked profiles mean late changes can be absorbed without waiting on overseas shipments. One supplier is accountable for the channel layout, so there is a single point of contact when a revision lands. The channel drawing becomes a fixed reference for every trade working in the ceiling.
What to do next
If your RCP is still moving, talk to us early. We can set a sign-off point that protects the programme and still allows for late changes.
Protect your ceiling from drawing to delivery
UK-Manufactured, Pre-Coordinated SEAM and REVEAL channels from up to 100% recycled aluminium.
Talk to us earlyRelated products
Related guides
All eight guides
- Late M&E information on the RCP
- Ceiling clashes found on site
- When ceiling grids don't align
- RCP revisions that don't reach site
- Value engineering and ceiling substitution
- Tolerances on aluminium ceiling profiles
- Ceiling compliance versus design intent
- Keeping control of the ceiling after novation