Coordinated RCPs: eight problems and how to solve them
Most ceilings don't fail in design. They fail between the RCP and site. On almost every commercial fit-out, the same eight problems pull the ceiling away from the design intent. The common thread is that nobody owns the ceiling as a whole. These guides explain each problem, why it keeps happening, and how pre-coordinated SEAM flush and REVEAL recessed channels solve it.
Late M&E information on the RCP
Give services a fixed home before the M&E design is finished.
Ceiling clashes found on site
Solve clashes on the drawing, not on the day.
When ceiling grids don't align
Tie the ceiling, lighting, façade and partition grids together.
RCP revisions that don't reach site
Keep every trade working from one coordinated drawing.
Value engineering and ceiling substitution
Write measurable reasons to hold the spec into your NBS clause.
Tolerances on aluminium ceiling profiles
Why +/- 1mm extruded profiles keep long runs true.
Ceiling compliance versus design intent
Fit sprinklers, detectors and access without breaking the layout.
Keeping control of the ceiling after novation
Protect design intent once the contractor takes over.
Protect your ceiling from drawing to delivery