The problem
After novation, the architect works for the contractor. Cost and programme take priority, and the architect has limited say over product changes. The ceiling is often where this shows first. Details are simplified, products are swapped and the design the end client signed off is diluted, one change at a time.
Why it keeps happening
Design intent that relies on drawings alone is easy to reinterpret. If the ceiling detail is not tied to a specific system with a clear benefit to the contractor, it becomes a target for savings.
How A&L solves it
SEAM and REVEAL protect design intent by making the right choice the easy choice for the contractor too.
- Pre-coordinated before novation. The channel layout is fixed in the RCP at Stage 4, so it is part of the design the contractor inherits.
- Specified by performance. Our NBS clause sets out tolerance, material and recycled content, so substitution has to meet a clear standard.
- A benefit to the contractor. Cut-to-length, pre-coordinated channels cut site time, reduce clashes and lower the risk of variations.
- Programme certainty. UK-manufactured and UK-stocked, with a 4-week lead time from signed-off drawings.
We already work directly with Design & Build main contractors. That means the system you specify can stay in place after novation, supplied by the same team that coordinated it.
What to do next
Bring us in before novation. We will coordinate the channel layout with you and support the contractor through to delivery.
Protect your ceiling from drawing to delivery
UK-Manufactured, Pre-Coordinated SEAM and REVEAL channels from up to 100% recycled aluminium.
Talk to us earlyRelated products
Related guides
All eight guides
- Late M&E information on the RCP
- Ceiling clashes found on site
- When ceiling grids don't align
- RCP revisions that don't reach site
- Value engineering and ceiling substitution
- Tolerances on aluminium ceiling profiles
- Ceiling compliance versus design intent
- Keeping control of the ceiling after novation